Well the last couple of weeks have hard going, We started striping out the bathroom but the problem with that is we have to put everything away each evening as it is the only bathroom. The first thing was to replace the shower, as this was going in a different position no problem, it took fourteen hours to assemble and connect, a few setbacks like no water pressure and then kinked flex connectors. All the walls were striped of tiles and then plaster boarded ,then it was time for the WC new one in first then connect to the old down pipe no problem, except when we flushed ,the waste would not go down ?, Septic tank full ,two day’s and €166 poorer , septic tank & soak away emptied and cleaned ( No need to worry again for four years) . We have still a long way to go, all the tiling and a new window to install.
We have to get planning permission for the window from the Town hall and from our next door neighbour, because it will overlook his garden.
Well update soon.